Sign inSign in

Amortized cost (potential method)

The sum of the actual cost of an operation and the change in potential resulting from that operation.
Watch it explained

Know first

Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.

Actual cost1Potential method1

Lecturers

1

    Connections

    2

    The lectures that define it or assume it, and the concepts next to it.

    Concept1

    Lecture1

    1 lecturer. Definitions are written by AI from each lecture’s transcript. A time with a play mark starts the lecture at the moment the lecturer says it.