ConceptEngineering
Bottom-up assessment
A cost estimation method based on summing individual design components and vendor costs.
Know first
Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.
Cost estimation1Design drawings1
Lecturers
1Connections
2The lectures that define it or assume it, and the concepts next to it.