ConceptEngineering
Branch misprediction penalty
The cost in wasted cycles when a processor incorrectly predicts the outcome of a conditional branch.
Know first
Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.
Lecturers
1Onur Mutlu
Connections
4The lectures that define it or assume it, and the concepts next to it.