Sign inSign in

Interconnection queue

The formal application process with a grid operator to secure the right to connect a power plant to the electrical grid.
as Kirsten Stasio defines itStanford University
Watch it explained

Know first

Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.

Grid operations and transmission capacity1

Lecturers

1

    Connections

    1

    The lectures that define it or assume it, and the concepts next to it.

    Lecture1

    1 lecturer. Definitions are written by AI from each lecture’s transcript. A time with a play mark starts the lecture at the moment the lecturer says it.