In AI & ML
The distance or region around a separating line that defines the buffer zone before a point is misclassified.
In Engineering
An additional amount or reserve over and above a cost estimate included in a budget to handle changes, unexpected items, and inefficiencies.
Know first
Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.
Opens up
Concepts that name this one as a prerequisite.
In AI & ML
1In Engineering
1Lectures that assume it
4Connections
11The lectures that define it or assume it, and the concepts next to it.