ConceptEngineering
Present control
Where you are told ahead of time what the disturbance sequence is.
Know first
Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.
Stochastic finite horizon control1
Lecturers
1Connections
1The lectures that define it or assume it, and the concepts next to it.