ConceptEngineering
Step size rules
Rules where step sizes are fixed ahead of time, such as constant step size, constant step length, square summable but not summable, or nonsummable diminishing.
Know first
Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.
Subgradient method2Iterative optimization algorithms1
Opens up
Concepts that name this one as a prerequisite.
Lecturers
1Stephen Boyd
Connections
4The lectures that define it or assume it, and the concepts next to it.