Sign inSign in
ConceptEngineering

Trace scheduling

An algorithm that identifies frequently executed basic block paths (traces) in code and optimizes them as a single straight-line block by handling off-path branches with compensation code.
Watch it explained

Know first

Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.

Basic blocks1Control-flow graphs1Profile-guided optimization1

Opens up

Concepts that name this one as a prerequisite.

Lecturers

1

    Connections

    5

    The lectures that define it or assume it, and the concepts next to it.

    Concepts4

    Lecture1

    1 lecturer. Definitions are written by AI from each lecture’s transcript. A time with a play mark starts the lecture at the moment the lecturer says it.