ConceptEngineering
Critical path
The longest delay path in the combinational logic that determines the minimum clock cycle time.
Know first
Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.
Combinational logic2Propagation delay2Build systems1Directed acyclic graph1Execution time analysis1Logic gates1Module1Module dependency graph1
Opens up
Concepts that name this one as a prerequisite.
Lecturers
2Each in their own terms, from the easiest level.
Onur Mutlu
The longest delay path in a circuit determining its maximum propagation delay.Teo Camarasu
The path where the sum of the nodes is greatest, representing the time it would take if we had infinite cores.
Lectures that assume it
1Connections
10The lectures that define it or assume it, and the concepts next to it.