Sign inSign in
ConceptEngineering

Critical path design

A design principle where the maximum logic delay is minimized in order to maximize performance and determine the clock frequency.
Watch it explained

Know first

Named as a prerequisite by the lectures that define this. The number is how many say so. A grey one has no page yet.

Clock cycle time1Combinational logic1Combinational logic delay1Critical path1Datapath delay1Single-cycle microarchitecture1

Opens up

Concepts that name this one as a prerequisite.

Lecturers

1
  • Onur Mutlu

    ETH Zürich · Undergraduate

    • 1:37:16Microarchitecture Fundamentals and Design II

Connections

5

The lectures that define it or assume it, and the concepts next to it.

1 lecturer. Definitions are written by AI from each lecture’s transcript. A time with a play mark starts the lecture at the moment the lecturer says it.